Skip to main content

FloodCube
Planning

Sustainable planning of stormwater management is crucial to avoid future damage.

FloodCube Planning

Your new building or coming infrastructure is made to last. And as design and planning decisions today will benefit generations to come it is ever more critical to consider tomorrow’s climate.

Significant cost and time savings

Making flood information available early in your processes can produce significant cost and time savings. You avoid late changes and approval delays. If the information is early and easily accessible it further paves the way for collaboration between professions.

Utilising advanced modelling and AI

Sustainable planning of stormwater management is crucial to avoid future damage. We utilize advanced modeling and AI to calculate surface water today and into the future with second-to-none precision and useability.

 

Our FloodCube makes flood risk information readily available for designers, planners, developers and authorities.

 

The FloodCube is used by customers such as Bergen Municipality, Skanska, OBOS, and Multiconsult. They all use the FloodCube for sustainable planning of stormwater management to avoid future damage.

Get in touch

Are you interested in learning more about FloodCube Planning? Please get in touch or request a demo.

Ida H. Haveraaen

Stormwater Engineer

ih@7analytics.no

Explore our platform

  • FloodCube Realtime

    A realtime flood warning solution

  • FloodCube Sensor

    Assess risk of flooding in real time

  • GeoCube

    Enables you manage risks with the needed acuity

  • RiskCube

    Making existing risk information available at your fingertip

What some of our
customers are saying

  • Jostein Mæland, COO at StormGeo

    “This collaborative R&D effort will allow business decision makers to leap from rainfall forecasts, which require fuzzy risk interpretations, to actionable flood inundation forecasts that communicate how high the water will rise at their assets and operations based on cutting edge flood modeling.”

  • Herman Smith, CDO at Multiconsult

    “Storm water is one of the main concerns as we see megatrends such as urbanization and climate change affecting every neighborhood. Because of this, the requirements from the authorities are becoming increasingly stricter when it comes to flood planning. As we integrate sustainable decision tools in our growing toolbox, this will be a great enabler for high precision storm water planning. Climate adaptation is relevant in a wide range of project, and a high priority field within the Multiconsult group.”

  • Morten Fenne, TeamLead & Consulting engineer at Prosjektil AS

    “The focus on urban flooding is increasing and
    we see a great advantages in being able to do simulations
    early in a planning phase. When using the FloodCube, we quickly get much more accurate and a correct picture of the flood situation, both with the current situation and with the planned development. The simulations help us to quickly identify the problem areas and we can easily try out different measures.”

  • Hogne Hjelle, Manager at WA-department, Bergen Municipality

    “7Analytics has developed a tool that can make calculations for before and after development situations, and which shown in a map solution. This is a new tool that makes it easy for advisors to change input data and to try out different runoff situations. At the same time, this could be a well-suited tool for case handling, in that it is easy to get an overview of what input data has been used in calculations that form the basis for a surface water plan.”

  • Torstein Oen, Prosjektleder OBOS Nye Hjem

    “One of several arguments was the flood situation during conservation. Through 7A’s analysis tools and expertise, the effects of floods in the future were quickly illustrated. We also received good input on the regulations surrounding the planning of buildings in flood-prone areas. The argument against conservation became very clear.”